Question 60

There are two right pyramids with a soni The two pyramids are similar in shape. The height of the first pyramid is 30m and taiof the smaller is 22.5 m. 36 men take 32 days to build the first pyramid. How many dayswould 54 rs of the sameefficiency take to build the second phyramid?

Solution

Since, total work done $$\propto$$ Volume of pyramids $$\propto side^3$$ 

Total work done to built pyramids = Total men working * Days take

Let days taken by 54 men to build the second pyramid = N

Now, 

$$\frac{36 * 32}{54 * N} = \frac{30^3}{22.5^3} = \frac{4^3}{3^3}$$

$$N = \frac{36 * 32 * 27}{64 * 54}$$

N = 9 days


SRCC Quant Questions | SRCC Quantitative Ability

SRCC DILR Questions | LRDI Questions For SRCC

SRCC Verbal Ability Questions | VARC Questions For SRCC

cracku

Boost your Prep!

Download App