Read the following scenario and answer the THREE questions that follow.
A T20 cricket match consists of two teams playing twenty overs each, numbered 1 to 20. The runs scored in any over is a non-negative integer. The run rate at the end of any over is the average runs scored up to and including that over, i.e., the run rate at the end of the k-th over is the average number of runs scored in overs numbered 1, 2, …, k, where 1 ≤ k ≤ 20, k a positive integer.
The following table indicates the run rate of a team at the end of some of the overs during a T20 cricket match (correct up to 2 decimal places), where 1 ≤ N - 2 < N + 6 ≤ 20, N a positive integer. It is also known that the team did not score less than 6 runs and more than 15 runs in any over.
What is the value of N?
correct answer:-1
Read the following scenario and answer the THREE questions that follow.
A T20 cricket match consists of two teams playing twenty overs each, numbered 1 to 20. The runs scored in any over is a non-negative integer. The run rate at the end of any over is the average runs scored up to and including that over, i.e., the run rate at the end of the k-th over is the average number of runs scored in overs numbered 1, 2, …, k, where 1 ≤ k ≤ 20, k a positive integer.
The following table indicates the run rate of a team at the end of some of the overs during a T20 cricket match (correct up to 2 decimal places), where 1 ≤ N - 2 < N + 6 ≤ 20, N a positive integer. It is also known that the team did not score less than 6 runs and more than 15 runs in any over.
In which of these pairs of over numbers, the team could have scored 22 runs in total?
correct answer:-4
Read the following scenario and answer the THREE questions that follow.
A T20 cricket match consists of two teams playing twenty overs each, numbered 1 to 20. The runs scored in any over is a non-negative integer. The run rate at the end of any over is the average runs scored up to and including that over, i.e., the run rate at the end of the k-th over is the average number of runs scored in overs numbered 1, 2, …, k, where 1 ≤ k ≤ 20, k a positive integer.
The following table indicates the run rate of a team at the end of some of the overs during a T20 cricket match (correct up to 2 decimal places), where 1 ≤ N - 2 < N + 6 ≤ 20, N a positive integer. It is also known that the team did not score less than 6 runs and more than 15 runs in any over.
In which of the following over numbers, the team MUST have scored the least number of runs?
correct answer:-1
Read the following scenario and answer the THREE questions that follow.
The upper hinge of a dataset is the median of all the values to the right of the median of the dataset in an ascending arrangement, while the lower hinge of the dataset is the median of all the values to the left of the median of the dataset in the same arrangement.
For example, consider the dataset 4, 3, 2, 6, 4, 2, 7. When arranged in the ascending order, it becomes 2, 2, 3, 4, 4, 6, 7. The median is 4 (the bold value), and hence the upper hinge is the median of 4, 6, 7, i.e., 6. Similarly, the lower hinge is 2.
A student has surveyed thirteen of her teachers, and recorded their work experience (in integer years). Two of the values recorded by the student got smudged, and she cannot recall those values. All she remembers is that those two values were unequal, so let us write them as A and B, where A < B. The remaining eleven values, as recorded, are: 5, 6, 7, 8, 12, 16, 19, 21, 21, 27, 29. Moreover, the student also remembers the following summary measures, calculated based on all the thirteen values:
Minimum: 2
Lower Hinge: 6.5
Median: 12
Upper Hinge: 21
Maximum: 29
Which of the following is a possible value of B?
correct answer:-3
Read the following scenario and answer the THREE questions that follow.
The upper hinge of a dataset is the median of all the values to the right of the median of the dataset in an ascending arrangement, while the lower hinge of the dataset is the median of all the values to the left of the median of the dataset in the same arrangement.
For example, consider the dataset 4, 3, 2, 6, 4, 2, 7. When arranged in the ascending order, it becomes 2, 2, 3, 4, 4, 6, 7. The median is 4 (the bold value), and hence the upper hinge is the median of 4, 6, 7, i.e., 6. Similarly, the lower hinge is 2.
A student has surveyed thirteen of her teachers, and recorded their work experience (in integer years). Two of the values recorded by the student got smudged, and she cannot recall those values. All she remembers is that those two values were unequal, so let us write them as A and B, where A < B. The remaining eleven values, as recorded, are: 5, 6, 7, 8, 12, 16, 19, 21, 21, 27, 29. Moreover, the student also remembers the following summary measures, calculated based on all the thirteen values:
Minimum: 2
Lower Hinge: 6.5
Median: 12
Upper Hinge: 21
Maximum: 29
Based on the information recorded, which of the following can be the average work experience of the thirteen teachers?
correct answer:-5
Read the following scenario and answer the THREE questions that follow.
The upper hinge of a dataset is the median of all the values to the right of the median of the dataset in an ascending arrangement, while the lower hinge of the dataset is the median of all the values to the left of the median of the dataset in the same arrangement.
For example, consider the dataset 4, 3, 2, 6, 4, 2, 7. When arranged in the ascending order, it becomes 2, 2, 3, 4, 4, 6, 7. The median is 4 (the bold value), and hence the upper hinge is the median of 4, 6, 7, i.e., 6. Similarly, the lower hinge is 2.
A student has surveyed thirteen of her teachers, and recorded their work experience (in integer years). Two of the values recorded by the student got smudged, and she cannot recall those values. All she remembers is that those two values were unequal, so let us write them as A and B, where A < B. The remaining eleven values, as recorded, are: 5, 6, 7, 8, 12, 16, 19, 21, 21, 27, 29. Moreover, the student also remembers the following summary measures, calculated based on all the thirteen values:
Minimum: 2
Lower Hinge: 6.5
Median: 12
Upper Hinge: 21
Maximum: 29
While rechecking her original notes to re-enter the smudged values of A and B in the records, the student found that one of the eleven recorded work experience values that did not get smudged was recorded wrongly as half of its correct value. After re-entering the values of A and B, and correcting the wrongly recorded value, she recalculated all the summary measures. The recalculated average value was 15. What is the value of B?
correct answer:-3
Read the following scenario and answer the three questions that follow.
A company awards incentives to its employees for successful project performances. It rates successful project performance in categories A*, A, B, and C. Employees, in solo projects rated A*, A, B, and C, are awarded incentives ₹6 lakh, ₹5 lakh, ₹3 lakh, and ₹1 lakh respectively. When a project has multiple team members, the following scheme is used to award the incentives:
For example, for a project rated A, with three members, the team lead gets ₹4 lakh, and the other team members get ₹2.5 lakh each. A project always has a single team lead.
Six employees: Altaf, Bose, Chakrabarthi, Dipa, Ernie, and Fatima receive a total of ₹45 lakh in incentives by participating in a total of eight different projects that does not involve any other person. Not all six employees are involved in all eight projects.
The following are additionally known about these eight projects:
1. One project involves all six employees. Four projects involve three each, and the rest, two each.
2. Exactly three projects are rated C, for which a total of ₹4.8 lakh is paid.
3. Only one project is rated A*.
What BEST is known about the team compositions for the projects rated C?
correct answer:-5
Read the following scenario and answer the three questions that follow.
A company awards incentives to its employees for successful project performances. It rates successful project performance in categories A*, A, B, and C. Employees, in solo projects rated A*, A, B, and C, are awarded incentives ₹6 lakh, ₹5 lakh, ₹3 lakh, and ₹1 lakh respectively. When a project has multiple team members, the following scheme is used to award the incentives:
For example, for a project rated A, with three members, the team lead gets ₹4 lakh, and the other team members get ₹2.5 lakh each. A project always has a single team lead.
Six employees: Altaf, Bose, Chakrabarthi, Dipa, Ernie, and Fatima receive a total of ₹45 lakh in incentives by participating in a total of eight different projects that does not involve any other person. Not all six employees are involved in all eight projects.
The following are additionally known about these eight projects:
1. One project involves all six employees. Four projects involve three each, and the rest, two each.
2. Exactly three projects are rated C, for which a total of ₹4.8 lakh is paid.
3. Only one project is rated A*.
What BEST is known about the team composition for the project rated A*?
correct answer:-1
Read the following scenario and answer the three questions that follow.
A company awards incentives to its employees for successful project performances. It rates successful project performance in categories A*, A, B, and C. Employees, in solo projects rated A*, A, B, and C, are awarded incentives ₹6 lakh, ₹5 lakh, ₹3 lakh, and ₹1 lakh respectively. When a project has multiple team members, the following scheme is used to award the incentives:
For example, for a project rated A, with three members, the team lead gets ₹4 lakh, and the other team members get ₹2.5 lakh each. A project always has a single team lead.
Six employees: Altaf, Bose, Chakrabarthi, Dipa, Ernie, and Fatima receive a total of ₹45 lakh in incentives by participating in a total of eight different projects that does not involve any other person. Not all six employees are involved in all eight projects.
The following are additionally known about these eight projects:
1. One project involves all six employees. Four projects involve three each, and the rest, two each.
2. Exactly three projects are rated C, for which a total of ₹4.8 lakh is paid.
3. Only one project is rated A*.
Total amount of money paid for projects rated A (in lakhs of Rupees) is:
correct answer:-5
Abdul has 8 factories, with different capacities, producing boutique kurtas. In the production process, he incurs raw material cost, selling cost (for packaging and transportation) and labour cost. These costs per kurta vary across factories. In all these factories, a worker takes 2 hours to produce a kurta. Profit per kurta is calculated by deducting raw material cost, selling cost and labour cost from the selling price (Profit = selling price - raw materials cost - selling cost - labour cost). Any other cost can be ignored.
Which of the following options is in decreasing order of raw materials cost per kurta?
correct answer:-1
Abdul has 8 factories, with different capacities, producing boutique kurtas. In the production process, he incurs raw material cost, selling cost (for packaging and transportation) and labour cost. These costs per kurta vary across factories. In all these factories, a worker takes 2 hours to produce a kurta. Profit per kurta is calculated by deducting raw material cost, selling cost and labour cost from the selling price (Profit = selling price - raw materials cost - selling cost - labour cost). Any other cost can be ignored.
Which of the factories listed in the options below has the lowest sales margin (sales margin = profit per kurta divided by selling price per kurta)?
correct answer:-5
Abdul has 8 factories, with different capacities, producing boutique kurtas. In the production process, he incurs raw material cost, selling cost (for packaging and transportation) and labour cost. These costs per kurta vary across factories. In all these factories, a worker takes 2 hours to produce a kurta. Profit per kurta is calculated by deducting raw material cost, selling cost and labour cost from the selling price (Profit = selling price - raw materials cost - selling cost - labour cost). Any other cost can be ignored.
Abdul has received an order for 2,000 kurtas from a big retail chain. They will collect the finished pre-packaged kurtas directly from the factories, saving him the selling cost. To deliver this order, he can use multiple factories for production. Which of the following options will ensure maximum profit from this order?
correct answer:-4
Abdul has 8 factories, with different capacities, producing boutique kurtas. In the production process, he incurs raw material cost, selling cost (for packaging and transportation) and labour cost. These costs per kurta vary across factories. In all these factories, a worker takes 2 hours to produce a kurta. Profit per kurta is calculated by deducting raw material cost, selling cost and labour cost from the selling price (Profit = selling price - raw materials cost - selling cost - labour cost). Any other cost can be ignored.
Abdul has introduced a new technology in all his factories. As a result, a worker needs just 1.5 hours to produce a kurta. If raw materials cost and selling cost remain the same, which of the factories listed in the options below will yield the highest profit per kurta?
correct answer:-2